gun attack police
| |

Gun attack on Police van kills two officers in DI …

DERA ISMAIL KHAN: Two police personnel, including an Assistant Sub-Inspector (ASI), were martyred after unidentified gunmen opened fire on a police van in the Daraban area of Dera Ismail Khan on Friday, authorities said.

According to officials from the Counter Terrorism Department (CTD), the attack occurred near Shah Alam Mor, where the police team was travelling to conduct an operation after receiving intelligence about the presence of suspected militants in the area.

As the police van reached the location, armed assailants launched a sudden attack, firing multiple rounds at the vehicle. The officers immediately returned fire, triggering a brief exchange of gunfire.

Despite the retaliation, two police officials, including an ASI, sustained critical injuries and were martyred in the line of duty. Officials said the attackers managed to flee the scene under the cover of the exchange of fire.

Security forces quickly cordoned off the area and launched a search operation to trace the attackers. Investigators are collecting evidence from the scene while intelligence agencies are assisting in identifying those responsible for the assault.

No group immediately claimed responsibility for the attack, but authorities are treating it as an act of terrorism.

The latest incident highlights the persistent security challenges in southern Khyber Pakhtunkhwa, where law enforcement personnel have increasingly come under attack during counterterrorism operations.

Police officials vowed that those behind the ambush would be brought to justice, reaffirming their commitment to continuing operations against militant groups despite the growing threats. The sacrifice of the fallen officers, they said, reflects the courage and dedication of Pakistan’s security forces in maintaining peace and protecting citizens.

Similar Posts

  • |

    Epstein Files , who is Gisele Attias Bonnouvrier?

    The release of the Epstein files by the US Department of Justice has brought a French modelling agent’s name into the spotlight, raising questions about her connections to the disgraced financier. Gisele Attias Bonnouvrier, who ran the “Mill Valley Connection” agency, was identified in 2013 email exchanges with Jeffrey Epstein, according to documents reviewed by student journalists at California’s Redwood High School. The emails, which came to public attention as part of the broader release of Epstein-related files, outlined potential business proposals between Bonnouvrier and Epstein. These included casting fees for introducing models, image usage rights, sponsorship of events and modelling conventions, and acting as his Paris correspondent. One specific message referenced: “Regarding Hannah, my Austrian model, we can come and see you this evening if you are interested, and in that case let me know how I can get my fees.” The correspondence suggests a transactional relationship centered around the modelling industry, though the full extent of their interactions remains unclear. The investigation began as a school assignment for Ben Mueller, a student at California’s Redwood High School, who scoured the Epstein files for connections to his local Marin County. His findings, which highlighted “Mill Valley” in an Instagram slideshow, gained widespread attention online. The exposure prompted Bonnouvrier to email the school demanding the removal of her name from the coverage and threatening legal action. In her communication, Bonnouvrier denied providing women to Epstein, and there is no public record of her facing criminal charges in connection with the case. The Epstein files, released by the US Department of Justice, have been a subject of intense public interest, revealing the extensive network of associates connected to the late financier. Epstein, who died in 2019 while awaiting trial on sex trafficking charges, had a long history of connections to powerful figures in politics, business, and entertainment. The release of these documents has reignited debates about accountability and the extent of Epstein’s influence. Bonnouvrier’s name is among dozens that have surfaced in the files, though her role appears to be that of a business associate rather than a direct participant in Epstein’s criminal activities. Her denial of providing women to Epstein and the absence of charges against her suggest that her involvement may have been limited to professional interactions. However, the nature of her correspondence with Epstein has drawn scrutiny, particularly given the context of his well-documented history of exploiting young women. The role of student journalists in uncovering Bonnouvrier’s connection to Epstein highlights the power of investigative journalism, even at the high school level. Mueller’s work demonstrates how ordinary citizens can contribute to holding powerful figures accountable. As the public continues to sift through the Epstein files, more names and connections are likely to emerge, shedding further light on the network of individuals who enabled Epstein’s activities. For now, Bonnouvrier’s name stands as a reminder of the far-reaching web of associates that surrounded one of the most notorious figures in modern history.

  • Systemic Failures Blamed in Fatal Rama 2, High-Speed Rail Accidents

    BANGKOK, Thailand — The Ministry of Transport has released investigation findings attributing two major infrastructure construction accidents to systemic safety and operational failures rather than structural material defects or machinery breakdowns, according to statements from senior transportation officials. Fire at Crane Collapse Site on Bangkok’s Rama II Road Jirapong Thepphitak, Deputy Permanent Secretary of the […]

  • | |

    Pakistan unveils four-year Hajj policy

    The government has introduced a four-year Hajj policy covering arrangements from 2027 to 2030. Federal Minister for Religious Affairs Sardar Muhammad Yousaf presented the policy on Wednesday. He described it as a major step toward improving and modernising Hajj arrangements in Pakistan. Speaking at a briefing, the minister said this was the first time the government had introduced a four-year Hajj policy. He said the initiative would provide a long-term framework for organising the pilgrimage. Yousaf said the policy had been prepared under the guidance of Prime Minister Shehbaz Sharif. It focuses on technology, transparency and improved services for pilgrims. According to the minister, the new framework aims to bring Pakistan’s Hajj arrangements closer to international standards. It will also introduce several new facilities for pilgrims. For the first time, applicants will have access to a registration and waiting-list system. The government expects the system to make the process more organised and transparent. The minister said the government and private Hajj schemes would retain their existing quota division. Sixty per cent of the quota will remain with the government scheme, while private operators will receive 40 per cent. The Ministry of Religious Affairs will continue to oversee and regulate Hajj arrangements. It will also monitor the performance of private Hajj companies. Under the new policy, applicants will be able to enter the pilgrims’ list after paying 10 per cent of the required amount. The government has also planned greater transparency in procurement. Purchases made in Pakistan and Saudi Arabia will be carried out through transparent procedures. Yousaf said any money remaining after meeting the required expenses would be returned to the pilgrims. The measure is aimed at improving financial transparency and protecting the interests of Hajj applicants. The government also plans to change the way private Hajj companies are monitored. Their registration and oversight will not depend only on the quota allocated to them. Instead, their performance will be an important factor in determining their registration and continued participation in the Hajj programme. A digital complaint-resolution system is also being introduced. Pilgrims will be able to submit complaints and seek quick action through the new system. An appeal mechanism will also be established. This will provide pilgrims with another channel to challenge decisions or seek resolution of their complaints. The minister said the government would also improve training programmes for Hajj pilgrims. The aim is to prepare pilgrims more effectively before their departure for Saudi Arabia. The Hajj Muhafiz Scheme will continue under the new policy. The government considers the scheme an important part of its arrangements for pilgrims. Yousaf said the new policy had been developed in line with Saudi Arabia’s Vision 2030. The framework is intended to improve coordination and service delivery during the pilgrimage. The minister said the government’s objective was not limited to managing logistical arrangements. It also wanted to ensure that Pakistani pilgrims received a dignified and comfortable Hajj experience. The estimated cost of the government Hajj package is expected to remain between Rs1.2 million and Rs1.3 million. However, the final cost may depend on various arrangements and expenses associated with the pilgrimage. Yousaf also clarified that any increase or decrease in Pakistan’s Hajj quota would require a decision from the federal cabinet. He said Pakistan had received recognition and awards for its Hajj arrangements in the past. The government now wants to further improve the system through long-term planning and greater use of technology. The four-year policy is expected to provide greater continuity in Hajj preparations. Officials believe the long-term framework will also make planning easier for both the government and pilgrims.

  • | |

    Saudi-US talks focus on easing regional tensions, …

    Saudi Crown Prince Mohammed bin Salman and US Central Command chief Admiral Brad Cooper have held talks on regional security and efforts to ease tensions, as the conflict involving Iran continues to threaten stability and global energy supplies. According to Saudi state media, the two officials discussed defence cooperation between Riyadh and Washington, developments across the region and diplomatic efforts aimed at reducing tensions and strengthening security. The meeting came as concerns surrounding the Strait of Hormuz intensified. The strategic waterway remains a major route for global oil and liquefied natural gas shipments, and disruptions caused by the conflict have raised fears of further pressure on international energy markets. Saudi Arabia also announced the launch of a multinational defensive maritime alliance, with 13 countries joining the initiative. Representatives from 39 countries attended a planning meeting held at the Western Fleet Command in Jeddah, which Saudi authorities described as an important step towards putting the alliance into operation. Meanwhile, Washington has signalled that its economic and military pressure on Tehran could intensify. US Treasury Secretary Scott Bessent said the United States was preparing measures against Iran on a scale not previously seen in efforts to economically isolate a country. Bessent said the strategy would combine tougher economic restrictions with continued pressure surrounding the Strait of Hormuz. He indicated that further announcements could come next week as Washington seeks to increase pressure on Tehran. US Defence Secretary Pete Hegseth also said the US Navy could maintain a blockade of Iranian ports and shipping routes for an indefinite period, arguing that American forces had sufficient capacity to rotate vessels and sustain the operation. The standoff has already severely affected shipping through the Strait of Hormuz. Traffic has fallen sharply compared with levels recorded before the conflict, when roughly 130 to 140 vessels passed through the waterway each day. The decline has raised concerns about disruptions to international energy supplies. Tensions escalated further after two vessels operated by Abu Dhabi National Oil Company were reportedly attacked while travelling through the strait. The UAE condemned the incident and blamed Iran for the attacks. Iran has rejected US claims over control of the waterway and has indicated that normal shipping will not resume until its demands are addressed. Tehran has called for the removal of economic sanctions and the release of frozen Iranian assets. The conflict is also putting increasing pressure on global oil markets. The International Energy Agency has revised its estimate for the decline in global oil supply, projecting a reduction of about 4.3 million barrels per day this year, equivalent to around 4% of global supply. Although oil prices fell by more than 2% on Thursday amid concerns over weaker demand and rising US crude inventories, renewed reports of attacks linked to Iran-backed forces have continued to fuel uncertainty in energy markets. The economic consequences are spreading beyond the region, with economists warning that a prolonged conflict could significantly weaken global growth and increase the risk of recession in some economies. US President Donald Trump has faced growing domestic pressure to bring the conflict to an end as higher fuel prices weigh on American consumers and threaten his political standing ahead of November’s midterm elections. While Trump has repeatedly warned that military action against Iran could escalate, he has so far avoided deploying ground troops or launching attacks against some of the region’s most sensitive strategic targets. More recently, he has indicated a greater reliance on economic pressure. Hegseth, meanwhile, said Washington’s priority remained preventing Iran from acquiring a nuclear weapon and declined to comment on whether previous ceasefire decisions had been mistakes. With diplomatic efforts struggling and tensions around the Strait of Hormuz continuing, Saudi-US security coordination is emerging as a key factor in attempts to contain the wider regional crisis and protect vital international shipping routes.

  • | |

    Trump’s new hairstyle sparks buzz and memes online

    US President Donald Trump has once again become the centre of attention on social media. This time, the focus is not on politics. It is on his hairstyle. Trump recently appeared at an event in Las Vegas. He attended the gathering at the Red Rock Casino Resort. Photos from the event quickly spread across social media. Many users noticed that Trump’s hair appeared thicker and fuller than usual. The change soon became a talking point on X. Users shared comments about the president’s appearance. Several also posted memes and humorous reactions. Some social media users suggested that Trump may have changed his hairstyle. Others revived older rumours about his hair. The latest pictures have also brought renewed attention to long-standing speculation about whether Trump has undergone a cosmetic procedure involving his hair. One of the claims circulating online involves an alleged scalp reduction surgery. However, there is no independent confirmation that Trump underwent such a procedure. Trump has also not publicly addressed the latest speculation about his hairstyle. Questions about the US president’s hair have existed for decades. Some of the older claims were linked to his highly publicised divorce proceedings in the 1990s. During those legal proceedings, Trump’s former wife, Ivana Trump, reportedly referred to an alleged hair-related surgical procedure in court testimony. The claims have continued to attract public interest over the years. Trump’s distinctive hairstyle has become one of his most recognisable features. His latest appearance in Las Vegas has now revived that interest. Images from the event have been widely shared online. As memes continue to circulate, social media users remain divided over whether Trump’s hair simply looked different because of styling, lighting or another reason. For now, there is no verified evidence confirming that the change was the result of a cosmetic procedure.

  • |

    ECNEC approves Rs1.15tr development projects amid major cost escalations

    ISLAMABAD: The government has approved 16 development projects with a combined estimated cost of around Rs1.15 trillion, including the controversial Lahore-Sahiwal-Bahawalnagar motorway and the fifth extension of the Tarbela hydropower project, whose cost has surged by nearly 282% from the original estimate. The decisions were taken by the Executive Committee of the National Economic Council (ECNEC), chaired by Deputy Prime Minister Ishaq Dar. Several of the projects had previously been considered by development forums and returned with revised costs following delays, changes in scope and rising construction expenses. Of the total approved amount, approximately Rs320 billion represents additional expenditure linked to cost increases and delays, highlighting the financial pressures facing major public-sector development schemes. The government, however, issued only a brief statement following the ECNEC meeting and did not provide a complete breakdown of all the projects and their financial details. The omission of the Lahore-Sahiwal-Bahawalnagar motorway from the official summary was particularly notable given the political controversy surrounding the scheme. Lahore-Bahawalnagar motorway approved The ECNEC approved the Rs407 billion Lahore-Sahiwal-Bahawalnagar Motorway project, retaining its original 295-kilometre alignment in accordance with a directive issued by Prime Minister Shehbaz Sharif earlier this year. The first package, covering an 18.5-kilometre stretch from the Lahore Ring Road to Raja Jang Interchange, was approved at an estimated cost of Rs49 billion through federal financing. The project has faced opposition from the Pakistan Peoples Party (PPP), which has raised objections to the scheme and its proposed alignment. Given the heavy financial burden on the Public Sector Development Programme (PSDP), the ECNEC directed the National Highway Authority (NHA) to examine public-private partnership options for sections that could attract private investment. For commercially viable portions, the NHA will arrange its contribution through its own revenues in the form of Viability Gap Funding. For sections that are considered financially unviable, alternative arrangements will be explored, including contributions from the Punjab government, loans or financing from international financial institutions and direct federal funding, subject to the availability of resources. Tarbela extension faces major cost increase One of the most significant approvals was the fifth extension of the Tarbela project, which received approval at a revised cost of Rs316 billion. The project’s original estimated cost stood at approximately Rs82 billion, meaning its revised price tag represents an increase of about 282%. The steep escalation has already attracted scrutiny from government officials. During the Central Development Working Party (CDWP) review, Planning Minister Ahsan Iqbal reportedly raised concerns over project management, transparency and oversight. Questions were also raised regarding the technical capacity of personnel associated with the project. The Ministry of Water Resources had previously highlighted shortcomings in an inquiry into problems encountered during project implementation. An inquiry into the failure of the downstream cofferdam reportedly concluded that the structural collapse was linked to design changes, inadequate supervision and delayed administrative action rather than flooding. The findings attributed the failure to the shift from roller-compacted concrete to a rock-fill structure, along with weaknesses in project oversight. The incident resulted in delays and financial losses, adding to concerns over the project’s rising cost. The Ministry of Finance also sought an explanation for the substantial increase in the project’s estimated cost. Since the scheme is being financed through international financial institutions, the ministry asked the Water and Power Development Authority (Wapda) to provide details regarding the mechanism for repayment. Despite the concerns and requests for additional information, the ECNEC ultimately approved the revised project cost. Road and infrastructure schemes The committee also approved the 48-kilometre Khwazakhela-Besham Expressway at a revised cost of Rs116.6 billion. The new estimate is around 47% higher than the original cost. Another interprovincial road scheme aimed at improving connectivity between Gilgit-Baltistan and Azad Jammu and Kashmir was approved at Rs29 billion, representing an increase of approximately Rs10 billion over its initial estimate. The Rathoa Haryam Bridge over the reservoir channel on the Mirpur-Islamgarh Road also received approval at a revised cost of Rs10.8 billion. Its original estimate had been only Rs1.4 billion, reflecting a substantial increase over the initial projection. The ECNEC further approved the Lahore Wastewater Treatment Plant at a cost of Rs56.6 billion, around Rs4.2 billion above the earlier estimate. Poverty alleviation and education initiatives The Southern Punjab Poverty Alleviation Project was approved at Rs29.7 billion and will cover 10 districts: Bahawalnagar, Bahawalpur, Bhakkar, Dera Ghazi Khan, Khushab, Layyah, Mianwali, Muzaffargarh, Rahim Yar Khan and Rajanpur. The scheme includes an additional cost escalation of around Rs6.8 billion and is aimed at improving socioeconomic conditions and livelihood opportunities in some of the region’s less-developed areas. The ECNEC also sanctioned Rs10.6 billion for the Fulbright scholarship programme, under which 816 scholarships are planned. Of these, 550 MS and 141 PhD scholarships will be administered through the United States Educational Foundation in Pakistan (USEFP), while the Higher Education Commission (HEC) will provide funding for another 125 PhD scholarships through the PSDP. Water projects in Sindh and Balochistan The Mazarani Dam project in Qambar Shahdadkot, Sindh, was approved at an estimated cost of Rs16.1 billion. The committee directed the provincial authorities to begin Command Area Development alongside construction of the main dam so that the project’s agricultural and economic benefits could be realised during its second phase. The Winder Dam project was also approved at Rs21.6 billion, with the federal government expected to contribute Rs15.6 billion. Meanwhile, the Mashkel Dam in Washuk, Balochistan, received approval at a cost of Rs41 billion. The project will be financed by the Balochistan government, while an environmental assessment report will be incorporated into the official project documentation.w Power-sector efficiency projects The ECNEC approved several schemes aimed at improving the performance of electricity distribution companies. A Rs24 billion project for the Supply, Installation, Testing and Commissioning of Asset Performance Management Systems at Lahore Electric Supply Company (LESCO) was approved. The committee also sanctioned Rs19 billion for the Electricity Distribution Efficiency Improvement Project of Hyderabad Electric Supply Company (HESCO). A similar initiative for Peshawar Electric Supply Company (PESCO) was approved at Rs30.2 billion. These projects are intended

Leave a Reply

Your email address will not be published. Required fields are marked *