Pattaya Advances Plan for Three-Line Monorail Project
PATTAYA, 13th of August 2026
Pattaya City Mayor Poramese Ngamphichet on Thursday chaired a progress meeting on the revision of the Environmental Impact Assessment (EIA) report for the city’s proposed monorail mass transit system. The project comprises three lines: the Green Line, Red Line and Purple Line.
The meeting took place in Meeting Room 131 at Pattaya City Hall and was attended by Mr. Bancha Kulawanich, Secretary to the Mayor; Mr. Wachira Thongdeelert, Assistant Secretary to the Mayor; heads of relevant government agencies; and other related organisations. Project Engineer Mr. Jadur Paensuwan presented the latest progress report.

As a world-class family friendly tourist destination with strong economic potential, Pattaya has experienced rapid urban expansion and a steady rise in both residents and visitors. This growth has intensified traffic congestion, particularly along major roads and in key tourist zones. To address these challenges, the city has studied the feasibility and design of a monorail system designed at upgrading public transport, reducing private vehicle use, improving travel convenience and safety, and supporting future urban development.

The three proposed monorail routes are as follows:
– Green Line: The primary intra-city route linking business districts, tourist attractions and major economic areas. Key stops include Pattaya Railway Station, Dolphin Roundabout, Terminal 21 Pattaya, Central Festival Pattaya, Pattaya Night Bazaar, and Bali Hai Pier.
– Purple Line: A connecting route between Pattaya City and the Nong Prue area. It seeks to improve travel efficiency, ease traffic congestion within Pattaya and link with the Pattaya Railway Station.
– Red Line: A longer-term development plan that shares an initial section with the Green Line before branching off to run parallel to Jomtien Beach towards the National Stadium area. The line is intended to support development under the Neo Pattaya concept.
The meeting resolved that Pattaya City will proceed with revisions and the preparation of additional supporting data for the EIA report. Officials are currently compiling information and refining details. Further public hearings are expected between September and November 2026. A revised report will then be prepared and submitted for the subsequent review process, with the complete final report anticipated around January 2027.
Pattaya City remains committed to carefully following all environmental procedures while providing opportunities for public and business participation. The goal is to advance an efficient mass transit system that connects key areas, alleviates traffic problems, enhances residents’ quality of life, and supports Pattaya’s sustainable growth as a modern tourist and economic city.
News: Miss Natcha Tripipat
Photos: Mr. Somprasong Photphan
Public Relations Division, Office of Tourism and Sports