detouring development

Detouring Development

Development is the process of creating lasting improvements in the lives of people by addressing their genuine social, economic, and public needs and not merely constructing new infrastructure, completing projects, impressive photographs, or utilising the allocated public funds. In a true sense, the real measure of development is whether the real problem has been solved, and whether the interventions have created sustainable public value and an evident change in social or economic conditions of the society.

A project should begin with a clearly defined problem and public need. Its vision, goals, activities, and measurable indicators should follow the problem. In professional project management practices, all these elements are recorded in the planning and design phase. In Pakistan, we have mastered the art of reporting these elements without achieving any meaningful results.

Imagine a public park surrounded by a steel fence. Children and families using the park are visible from the road. If funds are available and privacy is the genuine concern, the executing agency can add steel sheets, plant trees, or use temporary screens. Each solution is inexpensive and retains the existing structure. However, if the focus is primarily on expenditure, the agency may remove the functioning fence and replace it with a new brick wall. This may have a longer life, but is not necessarily the most economical or appropriate solution.

Considering Pakistan’s fragile economic outlook, many major development projects are financed through foreign loans. Such funds are eventually repaid, often with interest. Money spent on an unnecessary intervention is no longer available for genuine public need. This is a recurring weakness in Pakistan, where success is measured by the money spent, not by the effectiveness of the solution. This recalls Peter Drucker’s observation. “There is nothing so useless as doing efficiently that which should not be done at all.”

The continued existence of infrastructure built during the Mughal and British periods is in contrast with contemporary projects, which deteriorate within years. This might be a romantic comparison, influenced by the fact that we see only the structures that survived, but durability and long-term public value are not central to our project culture.

The same mindset is evident in urban beautification schemes. Imagine a local government installs a 15-foot-high statue. The project is indeed beautiful and will produce attractive photographs for official reports, but if the same statue is mounted on thoughtfully designed columns, the shaded seating can be utilised by daily wage workers who gather at bus stops, on footpaths, and in other public spaces because no designated facility is available. This is not an encroachment issue, but a planning failure. Planners and designers should use one intervention to achieve multiple objectives.

Imagine a decades-old roundabout, with a working fountain surrounded by grass. During hot afternoons, labourers and children visit the site to cool themselves in the fountain’s spray. Officials might consider this behaviour undesirable and wish to block access. They can barricade it through small trees or shrubs, but the typical response will be to uproot the entire structure, construct a new fountain, and replace the grass with artificial green carpet. The public behaviour may reflect the unavailability of affordable recreational areas or public bathing facilities. Yet, the official solution destroys a functioning public asset, removes a natural green area, and spends substantial funds without addressing the underlying need.

Needs assessment appears in project reports, but they are rarely conducted with sufficient depth. Imagine a posh housing society, where tubewells were eventually replaced by private borewells. Residents have spent a considerable amount to arrange their own water supply. Now, if any government agency has received funds for water distribution, they should spend it in areas where the people are still digging borewells or have no access to clean drinking water. However, again the typical response will be to spend millions in this posh area, where households have already arranged their own water supply. The fall of the water table is the real problem, which in this case will persist after spending millions.

Pakistan has an extensive planning structure, which includes the federal and provincial bodies, planning departments in government organizations, consultants, and project management units. In 2025-26 alone, the National Economic Council approved the national development portfolio of 4.224 trillion. Such substantial expenditure should produce visible and lasting improvement in people live. The problem, therefore, is not insufficient funding, but how projects are identified, designed, approved, and evaluated.

The same problem is visible in education, health, and administrative projects. Consider a basic health unit or education facility with a leaking roof. The available funds should be directed to fix the roof. However, funds are allocated to boundary wall, new signage, and in some cases, for an entirely new building. Similarly, for decade, government departments are trying to digitise their operations. For a quick solution, these departments procure specialised softwares, which has high licensing costs, and inadequate training mechanisms. After years of implementation, enforcement, and expenditure, the same departments revert to paper files or to a new software.

The first step should be, to strengthen the capacity of all relevant staff in problem identification and root cause analysis. Every project initiation document should clearly identify the problem, public need, examine alternatives, and link the proposed intervention to public value. These elements should always be in quantifiable terms. Moreover, the project indicators should measure the extent to which the problem is solved and the post-completion evaluation should validate the visualized public benefits.

Institutions move energetically, spend heavily, and report extensively, but bypass the original problem. Pakistan does not simply need more projects; it needs projects to solve problems; it needs interventions that respond to genuine needs, preserve what already works, and provide sustainable public value. The true measure should not be the amount spent but the resolution of the problem. Unless problem-solving becomes central to planning and evaluation, fund utilisation will continue to be mistaken for development and detour away from progress we seek.

Writers 

Dr. Sikandar Bilal Khattak 

Academician with Research Interest in Sustainable Systems

Can be reached at sikandarbilal1@gmail.com

Dr. Abdul Shakoor

Professor and Higher Education Consultant with Research interests in Strategic Planning and policy development. 

Can be reached at drshakooruetp@gmail.com

Similar Posts

  • Road to the East

    The subject idea of “Road To The East” is conceived by me by a textbook when the store Marco polo was described a story with a title of road to the east. The fascination of culture is everywhere especially, within the walled city of Kashi which is located comparatively on a high altitude like a natural fort. As this area from central east was under the invasion of different ethnic communities in the past. I got a chance to walk through the downtown streets which are relatively wider than the downtown streets of Lahore. The construction of the houses is also showing its beauty and culture with their traditions. Now the walled city have totally been preserved by the Chinese government and as I mentioned the tourism have become one of the most important growing industry in the region. The most famous place historically in this region is called Eig Gah. That is this famous mosque was built during the fifteenth century with the capacity of 20,000 people, can offer a prayer within the, inside of compound. While there is a huge yard outside of this compound which is the center of an attraction for all the tourists. Vice President Pakistan-China Joint Chamber There was a camel ride for the tourist attraction and these camels are special, only found in the Gobie desert, with two humps. These kind of camels are also an iconic symbol of China same as panda. It was also arranged a horse ride for the tourist who love to have a picture by riding at the back of the horse. At one time, in this area, the horses were used to have mainly without saddles. The local people are very fond of music, almost every coffee house have the people to play the traditional music, as their tradition music is with the history of hundreds of years. Duff is one of a very important part of their music playing with one instrument called Algoza. Always with the musicians, there is a singer playing the ancient music even though I did not understand the meaning but I got to know that this was mainly related with the stories of their local warriors. The conventional tea houses normally have their dance performance showing heir culture and dance skill. That all is very amazing. I love to watch that performance in different tea shops. Now, the culture have expended in different restaurants where not only girls but also men perform their traditional dance. I hope we can be able to arrange a cultural linkage between the cities of Lahore and Kashgar. All that modern restaurants are very beautiful, a clean and rich with their construction style. The waiters always dressed up like a female servant serving in the royale courts. Most of them are very beautiful to pass an impression of a royale age. Food of Kashgar (Kashi) is very traditional and tasty. The local people are really lamb lovers. You can find halal food in every corner of Kashi. Where you never need to ask the food quality is halal or not. Despite that, I have experienced the most lamb served in all over China is mostly done by the Muslims. The horse meat is one of the traditional delicacy of this region. But normally in our society we refrain to eat it. Camel milk is served as a soveigner to all the visitors. It was my first time to experience the camel milk. Most of the Xinjiang due the weather is dry and the rainfall is very limited. Despite of this all, Xinjiang is very rich for its fruit production in recent years. Chinese government have paid a lot of attention to improve the agriculture and food industry. This have helped a lot for the locals to improve their life standard. The government have paid a special attention to develop an agricultural farming industry in this region.   Walnut once it was used to exported from Pakistan to China but the border trade now have become an iconic product of Yecheng, is normally called as the capital of walnuts. They have also developed a technology to cultivate pomegranate in a sandy surface. I really hope under the BRI agriculture, is one of the major subject in Pakistan. Can we be able to get an experience from China that how they converted their barren lands into green fields. This is my proposal to the green initiative Pakistan, is that they are willing to improve their yield capability by the technology that have already been successful in the similar environment. Pakistan with its huge barren land along with the Gilgit city which can be experienced by using the technology already existing in this region. Mines and minerals is one of biggest subject that we need to pay attention. Till today, we are not been able to address our natural resources in to a successive model. I have observed to Pakistan side is full of natural resources with mines and minerals while the other sider of the border have already established the biggest units of processing. My advice to our provincial government of Gilgit Baltistan that why they don’t take an opportunity as China is already a friendly country with Pakistan, with a will of the transfer of technology. That means this can change the entire financial position of this region. We feel there is a lack with the technology of preservation of food and fruits. GB as a basket of the fruits, is not able to perform its strength where there are a lot of chances to earn a technology or going for a joint venture to improve the life standard of locals.

  • Pakistan’s Next Strategic Advantage: From La…

    By Tahseenullah For decades, labour migration in Pakistan has largely been viewed as a response to unemployment and poverty. While this perspective has served its purpose, it no longer reflects the realities of today’s global economy. In the twenty-first century, labour mobility has become far more than an economic necessity—it is a strategic investment in human capital, national competitiveness and economic diplomacy. Countries that can produce skilled, certified and globally competitive workers will hold a distinct advantage in an increasingly interconnected labour market. As ageing populations, declining fertility rates and persistent labour shortages reshape developed economies, demand for skilled workers is rising across Europe, East Asia and other advanced markets. Pakistan, with one of the world’s youngest populations, is well positioned to seize this opportunity. The real challenge is not whether Pakistan has enough young people willing to work abroad, but whether it can equip them with internationally recognised skills, qualifications, language proficiency and professional competencies that meet evolving global labour market demands. Pakistan’s labour migration journey began with the establishment of the Bureau of Emigration and Overseas Employment in 1971, following the Gulf oil boom. Since then, more than 15 million Pakistanis have migrated through regular channels, contributing significantly to infrastructure, healthcare, construction, transport and service sectors worldwide while improving the livelihoods of millions of families back home. Today, overseas employment remains one of Pakistan’s most important economic assets. According to BEOE, 862,625 Pakistanis migrated for employment in 2023, followed by 725,672 in 2024 and 762,499 in 2025, with early trends indicating sustained international demand in 2026. Meanwhile, the Pakistan Migration Report 2025 and the State Bank of Pakistan estimate workers’ remittances at approximately US$38.3 billion in FY2024–25, representing nearly 9.34 percent of GDP. These remittances strengthen foreign exchange reserves, reduce poverty and support macroeconomic stability. Yet labour migration has rarely been treated as a strategic pillar of Pakistan’s long-term economic planning. The global labour market is undergoing profound change. According to the World Economic Forum’s Future of Jobs Report 2025, demographic shifts, technological advances and the green transition will create millions of new employment opportunities over the coming decade. Healthcare professionals, engineers, IT specialists, skilled technicians, renewable energy workers, construction professionals and caregivers are expected to remain in particularly high demand. Pakistan possesses a valuable demographic dividend, with nearly two-thirds of its population under the age of 30. However, this advantage will only translate into economic gains through sustained investment in education, Technical and Vocational Education and Training (TVET), international certification, digital skills and language training. The challenge is clear. The Pakistan Migration Report 2025 shows that nearly two-thirds of Pakistani migrant workers remain low-skilled or unskilled. While their contribution is invaluable, low-skilled employment often results in lower wages, limited career progression and greater vulnerability to labour market shocks. In contrast, highly skilled migrants generally access better jobs, stronger labour protections and significantly higher earnings. Pakistan must therefore move beyond a traditional labour export model towards a human capital export strategy. Success should no longer be measured simply by the number of workers leaving the country, but by the quality, productivity and global competitiveness of its workforce. Achieving this transformation requires comprehensive reforms. TVET institutions must align training with international occupational standards and labour market needs. Language education in German, Japanese, Korean and Italian, alongside digital literacy, workplace ethics and intercultural communication, should become integral components of workforce development. Market diversification is equally important. While Gulf Cooperation Council countries will remain Pakistan’s primary labour destinations, excessive dependence on one region exposes the country to geopolitical uncertainty and labour market fluctuations. Pakistan should actively expand regular labour mobility partnerships with Europe, Japan, South Korea, Australia and Canada, where structural labour shortages continue to grow. Government-to-government labour mobility agreements should become a strategic priority. Such partnerships can enhance transparency, reduce recruitment costs, improve worker protection and strengthen employer confidence in Pakistani talent. Simultaneously, Pakistan should pursue mutual recognition of qualifications and internationally accepted skills certification to facilitate smoother labour market integration. Institutional coordination will also be essential. The Ministry of Overseas Pakistanis and Human Resource Development, together with the NAVTTC, provincial TEVTAs, Overseas Employment Promoters, the Ministry of Foreign Affairs and Pakistan’s overseas missions, should implement an integrated national labour mobility framework supported by labour market intelligence, digital recruitment platforms and evidence-based policymaking. Pakistan can draw valuable lessons from the Philippines, whose migration governance combines ethical recruitment, mandatory pre-departure orientation, comprehensive worker welfare and strong overseas support systems. Adapting these practices would strengthen Pakistan’s reputation as a reliable source of skilled and protected migrant workers. At the same time, addressing irregular migration must remain a national priority. Preventing dangerous migration routes requires expanding legal migration opportunities, strengthening career counselling, improving public awareness, dismantling human smuggling networks and ensuring aspiring migrants have access to reliable information and affordable recruitment services. Labour migration should no longer be viewed solely as a means of reducing unemployment or increasing remittances. It should be recognised as a cornerstone of Pakistan’s economic diplomacy, human capital development and long-term growth strategy. The countries that will lead the future of global labour mobility will not necessarily be those with the largest populations, but those that invest in producing highly skilled, internationally certified and globally competitive talent. Pakistan has already demonstrated its ability to contribute to the global workforce. The next step is to move beyond exporting labour to exporting talent. By investing in skills, strengthening institutions, diversifying labour markets and promoting ethical, well-governed migration, Pakistan can transform its demographic dividend into one of its greatest strategic advantages. The world is searching for talent. Pakistan has the youth. What it now needs is the vision to turn that potential into global human capital leadership. Tahseen Ullah is a development and migration sector practitioner specializing in labour mobility, migration governance, education and child protection.

  • Democratic Technocracy and a New Administrative St…

    A truly democratic-technocratic model for Pakistan should also address the country’s administrative structure. Pakistan is too large and administratively complex to depend on highly centralized decision-making from Islamabad and provincial capitals. A modern governance system should therefore consider the creation of new provinces or constitutionally recognized administrative units, based on population, geography, economic viability, administrative accessibility, historical and cultural considerations, and the ability to provide effective public services. This distribution must not be based on the ground of nationality. In my personal opinion, in Pakistan, there is a very emotional and stimulation mind sets found everywhere, they create prejudice mentality among the whole nation. All provinces names should be on the basis of their respective specialty of that particular area. Sindh, Punjab, Khaiber pakhtoon kha, Balochistan, these names also must be changed to other names. This will remove the nation base mentality. The objective should not be to divide Pakistan on the basis of ethnicity, language or political rivalry. Rather, administrative boundaries should be designed around governance and public welfare. Where existing provinces have become too large to administer effectively, new administrative units could bring government closer to citizens, improve resource allocation, strengthen accountability and allow regional development plans to be tailored to local needs. Here is a very common example, as if there is a school, when strength of the students increases, school starts to produce more campus, this is just because of good administration, to deliver good services, to provide better education to all students equally. So same case is in Pakistan, now the population has been reached out more than 250 million. While, at the time of 1947, the population was 70-75 million, that was combined, west and East Pakistan both, and West Pakistan comprised of only 32-33 million. Now imagine, now the population is more than 250 million and provinces are same. The population has been increases up to 681%. Imagine….! Punjab population was 20 million in 1947, now in 2026 is 127 million. Sindh population was 6 million in 1947 and now in 2026 is 56 million. Similarly KPK was 11 million in 1947 and now is 41 million, Baluchistan was 4.3 million in 1947 and now is 15 million. By these figures, more provinces or administrative units must have been developed many years ago. When we look for cities of Sindh, as the largest opposition found in Sindh against this proposal, we see, Karachi population was 1 million and in 2026 is more than 20 million, Hyderabad was 5-6 lacs, means 500 to 600 thousands, and now in 2026 is 2.4 million. Similarly Tharparker population was almost 300 thousand only, now near to 2 million, Nawabshah, currently is SBA was 500 thousand in 1947 now in 2026 is almost 2 million, Larkana was 420 thousands and now is 1.7 million, Sukkur was 340 thousand in 1947 and now is 1.6 million. If I write the whole country data then we need many pages, so these main examples are presented to elaborate that new provinces or administrative units are compulsory in the country for the betterment of Pakistan and the people of Pakistan. Now, keeping in view the concept of new provinces or new administrative units, under a Democratic Technocracy model, each administrative unit could have an elected political government supported by professional technocratic administration. Citizens would elect their representatives, while key departments would be managed by qualified professionals and career administrators. Health systems could be led by experienced health administrators and public-health professionals; education by education-policy specialists; municipal development by professional urban planners and engineers; finance by qualified public-finance specialists; and agriculture, water, energy and industry by relevant technical experts. In current system, our all ministries have, very unfortunately, absolute irrelevant Persons to run that particular area, except a very few. Now see this model, would create a three-level governance architecture: Federal Government → Provincial/Regional Governments → Empowered Local Governments At the federal level, matters such as defense, foreign affairs, currency, national economic policy and other genuinely national responsibilities would remain centralized. At the regional level, governments would concentrate on sectors such as health, education, agriculture, provincial infrastructure and regional economic development. At the local level, elected governments would become directly responsible for municipal services, sanitation, water supply, local roads, primary healthcare, local education, waste management and other services that directly affect citizens. A New Map for Better Governance Pakistan should therefore be willing to have a serious national debate about whether the present administrative map remains optimal for the country’s future. The creation of additional provinces or administrative regions should be based on objective criteria rather than political convenience. A proposed new unit should undergo an independent feasibility assessment covering: – Population and geographic size – Administrative accessibility – Economic and revenue potential – Existing infrastructure – Healthcare and education requirements – Natural resources – Urban and rural population distribution – Connectivity and transportation – Fiscal sustainability – Public opinion and consultation – Protection of minority and regional rights No new unit should be created merely because a political group demands it, nor should a legitimate administrative reform be rejected simply because existing political interests oppose it. The principle should be simple: “Administrative boundaries should serve citizens-not political elites”. A smaller and more manageable administrative structure, combined with empowered local governments and professional administration, could make it easier to identify responsibility, measure performance and deliver public services. However, creating new provinces alone will not solve Pakistan’s governance problems. A smaller province with the same inefficient institutions would simply reproduce the same problems on a smaller scale. Administrative restructuring must therefore occur simultaneously with civil-service reform, fiscal decentralization, digital governance, merit-based appointments, independent oversight and strong local governments. The ultimate objective should be to create a Pakistan in which every citizen can reach an effective government institution without travelling hundreds of kilometers to a distant provincial capital, while every level of government remains constitutionally accountable to the people. This is where administrative reform and Democratic Technocracy meet: democracy determines representation, technocracy ensures competence,

  • Frozen in the Dark: Why Is Gilgit-Baltistan Left O…

    Connecting Gilgit-Baltistan (GB) to the National Grid—and guaranteeing a dedicated clean hydro quota—is not merely an infrastructural goal; it is an ecological imperative and the definitive key to realizing the region’s full potential. High in the Karakoram and Himalayan ranges, where soaring glaciers feed the roaring Indus River, sits Gilgit-Baltistan—a land defined by its breathtaking landscapes, strategic geopolitical footprint, and an excruciating policy failure. Though this high-mountain region acts as the primary water tower of Pakistan, generating the very lifeblood that sustains the nation’s agricultural heartland and downstream hydroelectric dams, its own citizens spend their lives in perpetual darkness. For nearly eight decades since independence, the people of Gilgit-Baltistan have endured a chronic, soul-crushing energy crisis. In the harsh high-altitude winters, when temperatures plunge far below freezing and regional run-of-the-river hydel plants freeze solid or lose flow, power outages stretch to an agonizing twenty-two hours a day. Entire cities like Skardu and Gilgit grind to an absolute halt. Modern medical facilities run on expensive, precarious diesel generators, students study by the dim flicker of kerosene lamps, and families are forced to strip fragile mountain ecosystems of firewood simply to survive the winter. This domestic isolation becomes outright tragic when set against the backdrop of broader South Asian regional integration. Today, cross-border grid interconnections are becoming standard practice across the subcontinent. India has built high-voltage transmission lines linking its power architecture with Bhutan, Nepal, Bangladesh, and Myanmar, while making major technical strides to link Sri Lanka across the Palk Strait. Under frameworks like the “One Sun, One World, One Grid” initiative, neighboring nations seamlessly buy, sell, and route cross-border electricity to balance seasonal surpluses and deficits. Bhutan finances its national development by wheeling clean hydro power directly into the Indian market. Nepal trades its monsoon hydro surpluses across borders to avoid spilling water, pulling power back when river flows decline. Even nations separated by deep political, geographic, and sovereign boundaries manage to run copper and steel across international borders so their citizens do not sit in the dark. Yet, after 79 years of shared history, Pakistan presents an embarrassing anomaly. The state has built a national power grid that spans thousands of miles from the Arabian Sea to Khyber Pakhtunkhwa, and downcountry Pakistan often wrestles with systemic generation capacity surpluses, yet it has failed to link its own sovereign territory of Gilgit-Baltistan to the National Grid. Gilgit-Baltistan remains an island—an off-grid enclave stranded inside its own country, cut off from the main transmission backbone. While foreign nations in South Asia trade thousands of megawatts in real time across sovereign borders, Pakistan’s own northern frontier cannot draw a single kilowatt from the national thermal and solar reserves down south during the freezing winter months. This policy neglect is even more absurd considering that mere miles from where local populations freeze, one of the greatest engineering feats in South Asian history is taking shape. The Diamer Basha Dam Project, currently under construction near Chilas on the River Indus, boasts an astounding installed generation capacity of 4,500 megawatts and an expected annual output of over eighteen billion units of clean, renewable energy. The dam will transform Pakistan’s national economy, but it raises a fundamental moral and legal question: will it transform the lives of the people living in its shadow, or will the power simply pass over their heads to serve distant urban centers while local towns remain dark? To correct a structural imbalance that has persisted since 1947, the Federal Government of Pakistan and the Water and Power Development Authority (WAPDA) must formally dedicate a guaranteed quota of 500 megawatts of power from the Diamer Basha Dam directly to Gilgit-Baltistan. This allocation is not an act of federal charity; it is a pragmatic, economically transformative, and ethically mandatory policy that aligns local resource rights with national progress. To understand why a 500-megawatt direct allocation is essential, one must look at the region’s fragile, isolated micro-hydel infrastructure. Historically, Gilgit-Baltistan has relied on small-scale localized plants built on seasonal mountain streams. While these plants function adequately during the summer melt, they are acutely vulnerable to climate shifts and freeze cycles. When winter arrives and glacial run-offs plummet, local power generation drops by over eighty percent. Because the region is not connected to the main transmission grid, it cannot import balancing power, leaving the local economy frozen. Despite possessing immense potential as an international hub for eco-tourism, organic agriculture, high-altitude software hubs, and gemstone processing, serious industrial investors routinely stay away due to acute energy insecurity. The cost of doing business is artificially inflated by reliance on imported fossil fuels, creating a cycle of underdevelopment that forces educated, talented youth to migrate to major cities downcountry in search of basic livelihoods. Allocating 500 megawatts out of Diamer Basha’s 4,500-megawatt capacity represents just eleven percent of the dam’s total output. For the national power sector, absorbing this slight allocation is negligible. For Gilgit-Baltistan, however, this capacity is transformative. It represents complete regional energy self-sufficiency, year-round grid stability, and surplus capacity to fuel industrial growth for generations. To execute this vision cleanly and equitably, a structured cost-sharing implementation model must be established between the federal center and the region. The federal government and WAPDA must formally ring-fence a 500-megawatt generation quota from the powerhouse specifically for the region at concessional local tariffs. In return, the regional government of Gilgit-Baltistan must take complete ownership of downstream execution. The regional government must build high-voltage transmission lines connecting the powerhouse at Chilas to major regional load centers like Gilgit, Skardu, Hunza, and Ghizer, while overhauling local grid stations and distribution lines. By dividing responsibility—federal generation matched by regional distribution—both parties build a long-overdue partnership rooted in shared accountability. An allocation of this scale does far more than illuminate living rooms; it fundamentally reshapes the socio-economic trajectory of the entire northern frontier. With a dependable baseload, Gilgit-Baltistan can transition from a subsistence economy to a value-added manufacturing and processing hub. Local mineral wealth—including high-grade marble, granite, and precious gemstones—can be processed

  • From Aspiration to Reintegration: Rethinking Pakis…

    By Tahseen Ullah  For millions of Pakistanis, migration is a journey of hope and opportunity. Its success depends not simply on departure, but on informed decisions, relevant skills, ethical recruitment and proper preparation. Labour migration is a continuum—from reliable information and guidance, authentic career planning through skills development, documentation, overseas employment, work-visa processing, registration and Pre departure orientation at Protectorate of Emigrants, worker protection, and return and reintegration. For Pakistan, strengthening every stage of this cycle is essential to making labour mobility safe, regular, skills-oriented and rights-based. A well-managed migration system can protect workers, reduce exploitation and irregular migration, enhance employability, and transform migration from a response to unemployment into a strategic investment in human capital, economic resilience and sustainable national growth. The journey begins with one critical step: making an informed decision about whether, where and how to migrate Planning for Informed Migration: Skills, Choices and Readiness The migration journey begins with access to reliable information and informed decisions about overseas labour markets, occupations, wages, destinations, costs, legal pathways and potential risks. Once the decision to migrate is made, preparation should focus on employability and readiness through relevant technical skills, recognised certifications, language proficiency, digital literacy, financial awareness, and knowledge of employment contracts and workers’ rights. Aligning skills and qualifications with the evolving demands of destination-country labour markets can help prospective migrants pursue safe, regular and sustainable employment opportunities. Recruitment, Work Visa and Pre-Departure: Safe Pathways Recruitment is a critical stage of the migration cycle and a key point of vulnerability. Pakistani workers can access overseas employment through licensed Overseas Employment Promoters, the Overseas Employment Corporation, or direct employment. Verified employers, transparent contracts, fair recruitment costs and accessible grievance mechanisms help prevent fraud and exploitation. The process also includes obtaining the required work visa through the relevant diplomatic mission, completing emigration clearance and registration for protection, and attending Pre-Departure Orientation at the Protectorate of Emigrants (PoE) offices, equipping migrants with essential knowledge of their rights, responsibilities, workplace safety and available support services. Post-Arrival: Protection and Productivity The migration journey continues after arrival. Migrants may face contract violations, wage disputes, unsafe working conditions, language barriers, discrimination or limited access to support. Effective labour protection, employer compliance, consular assistance and accessible referral mechanisms are essential. Well-protected migrants are more likely to remain productive and successfully integrate into the workplace. Return and Sustainable Reintegration: Turning Experience into Opportunity Return marks an important transition in the migration cycle, particularly for workers completing their contracts and returning to Pakistan. A planned return and reintegration strategy can help returnees make productive use of their savings, skills, experience and professional networks. Access to psychosocial, legal, financial and employment support, along with skills recognition, entrepreneurship opportunities and further training, can facilitate sustainable reintegration. With the right support, returnees can turn their overseas experience into productive livelihoods and contribute to local economic development. Challenges and Opportunities Pakistan’s migration system faces persistent challenges, including information gaps, fraudulent recruitment, irregular migration, high recruitment costs, low skills levels, limited recognition of qualifications, inadequate protection and weak reintegration mechanisms. Fragmented coordination across institutions can further reduce the effectiveness of the migration process. At the same time, significant opportunities exist. Pakistan’s young population, expanding skills base and growing international demand for workers in healthcare, construction, engineering, IT, caregiving, manufacturing and green sectors provide a strong foundation for expanding regular labour mobility. The opportunity is to move from a labour-export model to a human-capital and talent-mobility model—through demand-driven skills development, international certification, language training, ethical recruitment, stronger bilateral labour mobility agreements and effective protection across the migration cycle. The Way Forward Pakistan’s National Emigration and Welfare Policy 2026 provide a framework for managing migration through a whole-of-cycle approach, covering safe and regular migration, skills development, worker protection, welfare, and return and reintegration. Its success will depend on effective implementation through clear short-, medium- and long-term strategies, strong institutional coordination and measurable outcomes. Relevant organisations, including Migrant Resource Centres, can complement these efforts through awareness-raising, guidance and information on legal pathways, referrals, Pre departure orientation, reintegration of returnees to helping migrants make informed decisions and avoid fraud, exploitation and irregular migration. Going forward, the priority should be to translate policy commitments into practical outcomes for migrants and their families. This requires sustained institutional coordination, responsive services and a system that remains connected to changing labour-market needs and the realities faced by workers throughout the migration journey. If managed effectively, migration can go beyond providing overseas employment and remittances to become a pathway for skills transfer, productive return and improved economic opportunities—contributing to a more resilient and prosperous Pakistan. Tahseen Ullah is a development and migration sector practitioner specializing in labour mobility, migration governance, education and child protection. He can be reached at tahseenanthro@gmail.com  LinkedIn: Tahseen Ullah

  • Pakistan’s Defence Alliance: Is Islamabad Sh…

    Pakistan has just taken on a new kind of commitment, and it has caught people’s attention in a way that ordinary diplomatic announcements rarely do. Pakistan’s ties with Saudi Arabia go back decades, and its defence relationship with Türkiye has grown steadily closer in recent years, so cooperation between the three is not surprising on its own. What is new is the nature of the commitment: an attack on any one of the three countries is now to be treated as an attack on all three.   This is not really about whether Pakistan should be working with Saudi Arabia and Türkiye. It is about whether Islamabad has entered this arrangement with a clear enough sense of what it wants from it, and what obligations it may quietly be creating for the future.   It also helps to get the timeline right. This is not Pakistan’s first mutual-defence commitment with Saudi Arabia. Back in September 2025, the two countries had already signed a Strategic Mutual Defense Agreement, treating aggression against either as aggression against both. What is new in 2026 is the attempt to bring Pakistan, Saudi Arabia and Türkiye together inside one shared framework. Seen that way, this is less a first step and more a new layer added to a relationship that was already forming. An Alliance at a Complicated Moment The agreement comes at a difficult time. Pakistan sits right next to Iran and has a tense relationship with India, while both Saudi Arabia and Türkiye maintain strong economic ties with New Delhi. At the same time, Islamabad has to keep managing working relationships with Iran, China, the United States and its Gulf partners. Any defence commitment, then, has to be understood against several relationships that do not always move in the same direction.   Pakistan is also not entering this alliance from a position of comfort. The country is dealing with economic, security and political pressures all at once, along with instability on its Afghan border and a delicate Iran border to manage. That is a lot to balance already, which is exactly why the practical details of this new commitment matter more than the ceremony around its announcement. What Has Pakistan Actually Committed To? The basic idea is simple: an attack on one member is treated as an attack on all. But what does that actually mean in practice? What would genuinely trigger the commitment, and what military support would Pakistan be expected to give—or receive? And what happens if the three countries find themselves with different interests in the same crisis?   Pakistan’s own Foreign Ministry offered some sense of this in July 2026, saying that agreements of this kind mostly involve peacetime military cooperation, and that in an actual war, how far the commitment would go still needs to be worked out. If anything, that statement makes the case for more clarity, not less.   That uncertainty matters most in two situations close to home. If Pakistan faced another serious confrontation with India, would Saudi Arabia and Türkiye offer real support, given their own important ties to New Delhi? And if tensions with Iran escalated, would Pakistan be expected to take a position that could strain its relationship with its neighbour? Even the growing water dispute with India, one of Pakistan’s most basic security concerns, has not been publicly linked to any shared plan among the three partners. These questions remain open.   There is also a quieter concern worth sitting with. Saudi Arabia brings financial strength to the table, Türkiye brings a growing defence industry, and Pakistan brings manpower, real operational experience and nuclear deterrence. If these strengths are genuinely shared, all three countries could benefit. But if the load falls unevenly, with Pakistan carrying most of the manpower while its own position in a future India crisis stays unclear, the costs could end up outweighing the gains.   History offers a useful reminder here. In his 1983 book Can Pakistan Survive? The Death of a State, Tariq Ali examined Pakistan’s political system, its foreign policy, and the powerful role the military has long played within the state. The circumstances today are very different, but his broader question still feels relevant: can Pakistan turn its usefulness to other powers into lasting strength of its own?   Something else stood out alongside the agreement itself: the mood surrounding it. Governments naturally welcome diplomatic wins, but a defence pact carrying possible wartime obligations is a different kind of agreement than a trade deal. With so many practical details still unclear, the celebratory tone raises a fair question: is this a carefully thought-through long-term strategy, or mostly the excitement of the moment? Commitments this serious deserve a clear explanation before they deserve applause.   Pakistan must also make sure its growing ties with Saudi Arabia and Türkiye stay compatible with its long-standing relationship with China, and with the working relations it still needs with Iran and the United States. Strategic Relevance Is Not Strategic Autonomy Pakistan is becoming more important to other countries. Its military strength, its geography, its nuclear deterrence, and its relationships across very different global camps all give Islamabad real value in the eyes of others. But being useful to other countries is not the same as having a clear strategy of your own.   Strategic autonomy simply means that Pakistan knows what it wants and makes sure its partnerships actually serve that. It means asking not only what Saudi Arabia, Türkiye, China or the United States want from Pakistan, but what Pakistan wants from each of them in return. A country can be militarily valuable, geographically important and courted by several powers, and still have no defined national strategy behind it. That difference sits at the heart of this entire discussion.   Washington’s fairly quiet response also deserves attention. There is no evidence that the United States is deliberately setting a trap for Pakistan. But Islamabad should still think carefully about whether a closer Saudi-Pakistani security relationship could, over time,

Leave a Reply

Your email address will not be published. Required fields are marked *