rain forecast several
|

Rain forecast for several parts of Pakistan as flood risk rises

LAHORE: Rain is expected in several parts of Punjab, Balochistan, upper Khyber Pakhtunkhwa, Gilgit-Baltistan and Kashmir on Sunday, with authorities warning of possible flooding in urban centres and watercourses following increased rainfall.

According to the latest weather forecast, scattered showers are likely to affect different areas of the country, while parts of Punjab may experience intermittent rain during the day. The weather in Lahore turned pleasant on Sunday morning after rainfall was reported in various parts of the provincial capital.

The early-morning showers brought temporary relief from the prevailing heat and humidity, with residents experiencing relatively cooler conditions. Rain was reported in several localities, adding to the likelihood of water accumulation on roads and low-lying areas if the spell continues.

Meanwhile, the National Emergency Operation Center has warned that rainfall could lead to a rise in water levels and flows in major rivers across the country. The situation has prompted authorities to remain vigilant and closely monitor river channels, drains and vulnerable urban areas.

Officials have also highlighted the possibility of low to moderate-level urban flooding in several Punjab cities, including Rawalpindi, Gujranwala, Sialkot, Narowal, Faisalabad, Okara and Lahore.

Heavy or persistent rainfall in these areas could result in water accumulating on roads, underpasses and other low-lying locations, potentially disrupting traffic and routine activities. Relevant departments have been advised to remain prepared to respond to any emergency arising from the weather system.

The risk is not limited to Punjab. In Khyber Pakhtunkhwa, low to moderate flooding has also been forecast in rivers, streams and rain-fed waterways in Chitral, Upper Dir, Abbottabad, Shangla, Khyber, Orakzai, Kohat, Tank and North and South Waziristan.

Authorities have urged local administrations and disaster-management agencies in vulnerable districts to maintain close coordination and monitor developments, particularly in areas located near rivers, streams and seasonal rain drains.

Residents in low-lying and flood-prone areas have been advised to exercise caution, avoid unnecessary travel during heavy rainfall and stay informed about weather and flood alerts issued by the relevant authorities.

The latest warnings come as the country continues to monitor the impact of the ongoing monsoon activity, which can cause sudden increases in river flows and urban flooding in areas receiving intense or prolonged rainfall.

Similar Posts

  • |

    Former Turkish PM Davutoglu quits politics

    ISTANBUL: Former Turkish prime minister Ahmet Davutoglu has announced his decision to step away from politics and dissolve his Future Party, ending a decades-long political career that saw him rise as one of President Recep Tayyip Erdogan’s closest allies before becoming a vocal critic. Davutoglu announced the decision this week, saying he wanted to distance himself from what he described as a “dirty political climate” in Turkiye. He said the move was not a surrender but a step taken on moral grounds and a call for a broader rethink of politics. The former premier criticized issues including corruption, favouritism and weak accountability, saying these challenges had damaged public trust. He also raised concerns over the country’s presidential system introduced in 2018, arguing that it weakened checks and balances. Davutoglu began his career as an academic before entering politics. Born in Konya in 1959, he studied political science and international relations at Bosphorus University and later earned a doctorate in the same field. Before joining government, he worked as a professor and wrote several books on foreign policy. His academic reputation helped him become a key figure in shaping Turkiye’s international strategy. After the Justice and Development Party (AKP) came to power in 2002, Davutoglu joined the party and became a close adviser to Erdogan. He played an influential role in developing the “zero problems with neighbours” foreign policy approach, which aimed to improve relations with regional countries. He served as Turkiye’s foreign minister from 2009 to 2014 and became prime minister after Erdogan moved to the presidency in 2014. However, relations between the two leaders gradually weakened due to differences over governance, foreign policy and the distribution of political power. In 2016, Davutoglu resigned as prime minister and was replaced by Binali Yildirim. Three years later, Davutoglu left the AKP and launched the Future Party, presenting it as a conservative alternative focused on democracy and reforms. However, the party struggled to gain major public support and received a small share of votes in the 2024 elections.

  • |

    Manjrekar slams ‘lenient’ punishment for Jaiswal, Vaibhav

    MUMBAI: Former India batter Sanjay Manjrekar has criticised the International Cricket Council (ICC) for what he described as lenient disciplinary action against Yashasvi Jaiswal and Vaibhav Suryavanshi following separate incidents involving the young Indian players. Manjrekar expressed his frustration on social media after the ICC sanctioned Jaiswal and Sri Lankan fast bowler Asitha Fernando following an on-field confrontation during the Galle Test. Jaiswal and Fernando were involved in a heated exchange after the Indian batter was dismissed. The situation escalated when the two players moved towards each other and their heads made contact, prompting teammates and officials to intervene before the confrontation could develop further. The ICC found both players guilty of breaching its code of conduct and imposed a fine of 25 per cent of their match fees, along with one demerit point each. Manjrekar questioned whether the punishment was strong enough given the nature of the incident. He argued that the authorities should have taken a firmer position on conduct that could potentially undermine discipline and sportsmanship in international cricket. The former India international also referred to an earlier incident involving 15-year-old Vaibhav Suryavanshi, expressing disappointment that the youngster had received only a 50 per cent match-fee fine. His comments have renewed discussion about whether disciplinary measures in cricket are consistent across players and incidents, particularly when young cricketers are involved. The Jaiswal-Fernando confrontation attracted considerable attention because it occurred during a Test match, where players are expected to maintain discipline despite the intense pressure of international competition. The involvement of teammates in separating the two players prevented the incident from becoming more serious. The ICC’s decision means both Jaiswal and Fernando will carry a demerit point on their disciplinary records, although neither player received a suspension. Manjrekar’s criticism adds to the wider debate over how cricket’s governing bodies should respond to confrontations on the field. While fines are intended to punish misconduct, some former players believe stronger sanctions are necessary when physical contact occurs. The controversy also highlights the challenge faced by cricket authorities in balancing firm discipline with proportionate punishment. For now, the ICC decision stands, but Manjrekar’s comments are likely to keep the debate alive over whether international cricket needs tougher penalties for on-field clashes.

  • |

    Nepra approves Rs21.4bn investment plan for SEPCO, sets loss targets

    The National Electric Power Regulatory Authority (Nepra) has approved a Rs21.436 billion Distribution Investment Plan (DIP) for Sukkur Electric Power Company Limited (SEPCO), covering its transmission and distribution operations for the five-year Multi-Year Tariff (MYT) period from fiscal year 2025-26 through FY2029-30. Along with the investment plan, the regulator has also set provisional targets for transmission and distribution (T&D) losses, while directing SEPCO to improve project execution, digitalise operational data and strengthen its planning and monitoring mechanisms. SEPCO had originally requested approval for an investment programme worth Rs90.563 billion. However, after Nepra raised several questions regarding the proposed projects, costs, utilisation of existing assets and investment requirements, the power utility submitted revised details. Following the revisions, SEPCO reduced its proposed investment to Rs40.191 billion in information submitted to Nepra on June 19, 2026. The revised proposal included changes in investment priorities and network development requirements based on updated demand projections. The company also revised project costs in light of the latest Purchase Orders (POs). Nepra, however, found substantial weaknesses in SEPCO’s original investment submission. According to the regulator, the initial proposal did not adequately reflect actual field conditions and lacked a comprehensive assessment of the utility’s requirements. It also contained gaps in cost calculations and information concerning the utilisation of existing assets. The regulator stressed that future investment planning should be based on reliable data, realistic demand assessments and proper evaluation of existing infrastructure rather than relying solely on projected requirements. Low utilisation of previous investments raises concerns Nepra also raised concerns over SEPCO’s ability to execute projects and utilise approved investment funds effectively. During the previous control period, SEPCO had been allowed investment of Rs39.509 billion. However, the company utilised only Rs14.231 billion, representing around 36% of the approved amount. The regulator said the low utilisation rate raised questions about SEPCO’s project implementation capacity and the efficiency with which approved investments were being converted into infrastructure and operational improvements. Delays were particularly noted in projects falling under the STG head. Nepra attributed the slow progress to difficulties in acquiring land, procurement-related problems and inadequate coordination between relevant departments. The regulator indicated that these issues point towards weaknesses in project planning, monitoring of milestones and implementation. SEPCO asked to improve network performance Nepra has also expressed concern over SEPCO’s technical and operational performance, particularly its transmission and distribution losses and reliability indicators, including the System Average Interruption Frequency Index (SAIFI) and System Average Interruption Duration Index (SAIDI). The authority directed the company to strengthen preventive maintenance programmes, improve energy accounting and introduce stronger system controls. These measures, Nepra said, are necessary to reduce losses, improve reliability and ensure consumers receive a more stable electricity supply. SEPCO’s approved investment priorities include expansion and strengthening of its 132-kilovolt network, augmentation of the existing system to accommodate future electricity demand and the deployment of modern technologies. The proposed technological improvements include Advanced Metering Infrastructure (AMI), Supervisory Control and Data Acquisition (SCADA) systems and Geographic Information System (GIS)-based mapping. These technologies are expected to support better monitoring of the electricity network, improve operational efficiency and enhance safety and service quality. Independent consultant made mandatory In a significant condition attached to the investment approval, Nepra has required SEPCO to engage an independent third-party consultant to review and validate its future investment plans before they are submitted to the regulator. SEPCO has also been instructed to prepare detailed Terms of Reference (ToRs) for the consultant and obtain Nepra’s approval before beginning the procurement process. The regulator said independent validation would help ensure that future investment proposals are based on actual requirements and that proposed projects are properly justified. Nepra pushes digitalisation of SEPCO operations Nepra has further directed SEPCO to move away from manual data-management practices and establish a comprehensive digital system for its operational information. The authority noted that dependence on manual systems can result in errors, delays and inefficient decision-making. A fully integrated digital platform, according to Nepra, would allow the company to monitor its network in real time, improve demand forecasting and make investment decisions based on reliable data. The regulator has also adopted a dynamic approach to the approved investment programme, allowing adjustments on an annual basis as well as a mid-term review. SEPCO has been directed to submit its mid-term review by December 2027. The review will include updated electricity demand forecasts, progress on approved projects and the company’s financial performance. Provisional T&D loss target set at 16.31% For FY2025-26 and FY2026-27, Nepra has approved a provisional T&D loss target of 16.31% for SEPCO. The target includes a 1% allowance related to law-and-order conditions. The regulator has also ordered SEPCO to commission an independent third-party assessment of its T&D losses through an international consultant or consortium. The study is required to be completed within nine months, with the timeline taking effect from January 7, 2026, in accordance with the tariff rebasing decision. Nepra warned that failure to submit the required independent study within the prescribed period could result in the regulator applying benchmark loss levels. Under the benchmark framework, the applicable levels would include 5.32% high-tension (HT) losses and 1.85% low-tension (LT) losses, resulting in total distribution losses of 7.17%. Transmission losses would be set at 1%, while the overall technical loss ceiling would remain within the range of 8% to 10%.

  • | |

    Gillian Anderson makes shocking confession about h…

    Gillian Anderson has opened up about a deeply personal part of her past, revealing that one of her first relationships was with an older girl during her high school years. The X-Files star made the candid admission during a recent interview with The Sunday Times. Anderson, 58, reflected on her teenage years and explained that the relationship felt very different from the romantic experiences she would have later in life. According to Anderson, the relationship was “secretive and illicit” and something the two girls felt they had to hide. She also revealed that a boyfriend eventually discovered the relationship and ended their romance because of it. (Page Six⁠) At the time, Anderson said she did not identify herself as gay. She had already dated boys, and she explained that she did not have the language to fully understand or describe what she was experiencing. Her comments offer a glimpse into how Anderson’s understanding of her sexuality developed over time. She has previously spoken publicly about relationships with women, but her latest interview provides more detail about one of her earliest experiences. Anderson also reflected on her later relationships with women. She explained that, when she was younger, she did not necessarily imagine those relationships becoming lifelong partnerships. Her perspective has since evolved. Today, Anderson says she does not believe the gender of a person should determine whether they can be considered a life partner. She explained that the person she currently considers her life partner happens to be male, but she could feel the same way about a woman. (The Times⁠) The actress has been linked to The Crown creator Peter Morgan since 2016, although the pair have generally kept their relationship private. Anderson has also been married twice and has three children. (The Times⁠) Her openness about relationships comes at a time when sexuality and identity are also central themes in some of her recent work. Anderson stars in Teenage Sex and Death at Camp Miasma, a film that explores sexuality, identity and complicated relationships. For Anderson, however, the revelation is not simply about her teenage romance. It is about looking back at a younger version of herself and recognizing that she did not always have the words to understand her feelings. Her latest comments have given fans a rare glimpse into her personal journey while showing how her views on love and relationships have continued to evolve.

  • |

    Indian activists challenge AI-powered police surveillance following student demonstrations

    Indian digital rights activists and student leaders are challenging Prime Minister Narendra Modi’s government in the Delhi High Court over the deployment of artificial intelligence-powered mass surveillance during recent youth protests in New Delhi. Student activist Aishe Ghosh filed a petition with the Delhi High Court seeking to declare the police’s mass surveillance of demonstrators unconstitutional. The lawsuit requests the immediate destruction of all personal and biometric data collected during the demonstrations and asks the court to establish clear binding guidelines governing the use of surveillance technologies at public gatherings. The controversy intensified after photographs circulated showing a mobile police surveillance unit, branded “Ikshana” and developed alongside security firm CP Plus, deployed at the main protest site. The vehicle featured telescopic masts providing 360-degree coverage, AI-powered cameras, and real-time facial recognition capabilities that displayed face accuracy metrics to match attendees against law enforcement databases. Furthermore, police officers were documented recording the social media handles of arriving participants. Digital rights organisations, including the Internet Freedom Foundation, have formally requested the Delhi Police Commissioner to delete all biometric data gathered during the events. Advocates emphasise that India currently lacks a dedicated legal framework governing police deployment of facial recognition systems, making such intrusive measures disproportionate and illegal. During court proceedings, Solicitor General Tushar Mehta defended law enforcement actions, arguing that expectations of privacy at a public gathering were misplaced and asserting that the security measures were absolutely necessary in the interest of public order. Delhi Police maintained that the technology was used solely to identify individuals with criminal histories and count crowd size without restricting freedoms. The court challenge continues despite the end of the student demonstrations, which were triggered by widespread examination paper leaks in national competitive tests. The protests culminated in the resignation of Union Education Minister Dharmendra Pradhan and the announcement of a government panel tasked with overhauling the national examination system.

  • |

    Toxic gas leak kills eight at Bangladesh shipyard

    At least eight workers were killed and five others were reported missing after toxic gas leaked from a vessel at a shipbreaking yard in Bangladesh on Friday. The incident occurred at the Ferdous Steel Shipbreaking Yard and Recycling Factory in Chittagong, a major hub for ship dismantling on the country’s southeastern coast. Witnesses said they heard cries from inside the facility before fellow workers rushed several affected employees to nearby hospitals. Police said eight people had died while a search operation was underway for those still unaccounted for. Authorities have formed an investigation committee to determine the cause of the accident and ordered a safety audit of the shipbreaking facility. Officials said the vessel involved had previously been used to transport liquefied natural gas. Although the yard was reportedly classified as a compliant facility, fire service officials raised concerns about whether proper safety procedures had been followed before dismantling work began. According to fire service officials, vessels must be completely cleared of hazardous gases before workers begin cutting them apart. They said workers who were closest to the gas leak died, while others farther from the affected area survived. Firefighters recovered three bodies from the site and rescued several workers who were found unconscious. The injured were transported to hospitals for treatment. The shipbreaking industry along Chittagong’s coast stretches for around 25 kilometres and provides employment to tens of thousands of people. Bangladesh is one of the world’s major shipbreaking centres, but the industry has repeatedly faced criticism over workplace safety, labour conditions and environmental risks. One of the workers killed in the accident was identified as Palash Jaladas. His family was left devastated by the tragedy, with relatives saying his wife, Bhoumika Jaladas, is eight months pregnant.

Leave a Reply

Your email address will not be published. Required fields are marked *