monsoon rains trigger
|

Monsoon rains trigger flood warnings across Pakistan

Persistent monsoon rains continued to lash several parts of Pakistan on Tuesday, triggering fresh flood alerts, increasing river flows, and prompting disaster management authorities to remain on high alert as another spell of rain is expected over the next 24 to 48 hours.

According to the Pakistan Meteorological Department (PMD), weak monsoon currents are currently affecting the country’s upper and eastern regions, while a westerly weather system continues to influence northwestern areas. The department has forecast humid weather across much of Pakistan, with rain and thunderstorms likely in Kashmir, Gilgit-Baltistan, Khyber Pakhtunkhwa, and upper Punjab through Wednesday.

The Flood Forecasting Division (FFD) reported that the Indus River remains in a low flood situation at Kalabagh and Chashma, while water levels in all other major rivers are currently within normal limits or below the low-flood threshold. Authorities believe the overall hydrological situation is expected to remain stable over the next 24 hours, although scattered rainfall in the upper catchments may slightly increase river flows.

Chenab River Under Close Watch

Officials are closely monitoring the Chenab River after India released additional water from the Baglihar Dam following heavy rainfall in the upper catchment of the river. According to available reports, three spillway gates of the dam were opened on Monday, adding to the two spillways that had already been opened several days earlier, resulting in higher downstream water flows.

In response, the FFD has issued a low to medium flood alert for Head Marala during the next 24 hours. The latest hydrological data shows inflows of approximately 93,900 cusecs, while outflows stand at around 76,200 cusecs. Forecasts indicate inflows may range between 80,000 and 100,000 cusecs, with the river expected to remain in the low flood category.

Heavy Rainfall Recorded Across the Country

During the last 24 hours, widespread rainfall was reported in Khyber Pakhtunkhwa, Punjab, Balochistan, Gilgit-Baltistan, and Azad Kashmir.

Among the highest rainfall recorded by the PMD, Saidu Sharif received 86 millimetres, Kakul 71 millimetres, and Faisalabad 77 millimetres. Meanwhile, Sibbi remained the hottest city in the country with a maximum temperature of 44 degrees Celsius.

The FFD’s rainfall monitoring system recorded exceptionally heavy downpours in Faisalabad, where Ghulam Muhammad Abad Water Works received 126 millimetres of rain, while the WASA Head Office recorded 123 millimetres. Significant rainfall was also reported in Lahore, Sialkot, Gujrat, and several surrounding areas.

PDMA Warns of Urban Flooding and Landslides

Punjab’s Provincial Disaster Management Authority (PDMA) stated that monsoon rains affected most districts of the province over the past day. The authority said advance planning, timely deployment of drainage machinery, and emergency response teams helped clear accumulated rainwater from urban areas despite the heavy showers.

The PDMA warned that the current monsoon spell is likely to continue until August 5, with additional rainfall in upper catchment areas expected to increase water levels in eastern rivers and seasonal streams.

Authorities have cautioned that urban flooding remains a significant risk in Lahore, Rawalpindi, Gujranwala, Gujrat, Sialkot, Faisalabad, and Multan. At the same time, the possibility of landslides persists in Murree, Galliyat, and other mountainous regions due to continuous rainfall.

Authorities Urge Public to Take Precautions

Disaster management authorities have established flood relief camps in vulnerable districts to facilitate emergency response if required. Residents living near riverbanks, seasonal streams, and flood-prone areas have been advised to relocate to safer locations as a precaution.

Similar Posts

  • | |

    Climate authority summoned again as questions grow…

    Islamabad: The Pakistan Climate Change Authority has been called back before a Senate committee only days after Chairperson Sherry Rehman strongly questioned why a new authority was operating alongside the Climate Change Ministry, asked what new work it was actually doing and raised concerns over staff costs, duplication and the use of public money. The fresh meeting will again focus almost entirely on the authority, its work, projects, programmes and progress. The quick return of the issue to the committee has increased pressure on the authority to clearly explain why it exists and what results it has produced that the Ministry of Climate Change and Environmental Coordination could not already deliver. At the previous meeting, Sherry Rehman repeatedly asked officials what work the authority was doing that the ministry was not already responsible for. She questioned whether the government had effectively created a parallel structure carrying out the same work on climate mitigation, adaptation, coordination and policy implementation. Rehman said the presentation before the committee did not show a clear new role for the authority. She also questioned why another institution was being created at a time when the ministry itself was facing shrinking development budgets. One of the strongest moments came when the committee discussed the authority’s staffing and expenditure. Rehman referred to a sanctioned strength of 24 positions and said employee related expenditure had already reached around Rs 80 million according to the presentation placed before the committee. She questioned why these costs were being incurred when she could not see a clear difference between the work of the authority and the ministry. She warned officials not to treat the meeting as a routine presentation exercise and demanded direct answers about public spending and actual results. Rehman also questioned whether creating the authority had brought new climate experts into government. Members asked whether the purpose was to recruit technocrats who could not otherwise be brought into the ministry. However, Rehman said the presentation appeared to show many of the same officials who had already worked inside government departments. She described the situation as a reshuffling of bureaucracy rather than the creation of a new technical institution. She said fragmentation was already a major government problem, with different organisations working separately on connected climate and disaster issues. According to her argument, creating another body without a clearly different mandate could increase costs while making responsibility more confusing. Rehman also questioned why the authority had been activated years after the law creating it first appeared. She said the law allowed the authority to exist but argued that this did not necessarily mean the government was forced to operationalise it. She said earlier governments had discussed removing such overlapping structures instead. During the exchange, she said she had opposed operationalising the authority while serving as minister because she feared it would create duplication. She told the committee that the result now appeared close to what she had warned about: officials were moving between the ministry and the authority instead of creating a completely new technical team. The authority defended its role. Dr Muhammad Rafiq told the committee that the authority was originally designed to provide technical support to the ministry. He acknowledged that more explanation was needed regarding what the authority was delivering against its original responsibilities. He suggested that the ministry and authority should be given an opportunity to return with a clearer presentation explaining what results they expected to achieve and what the authority could do that the ministry could not. The committee was told that the authority was still incomplete. Officials said a permanent chairperson was still being appointed and that only three members were working at the authority with a limited number of staff against the total positions planned. The authority also presented one of its strongest arguments in defence of its performance. An authority member told the committee that it had become Pakistan’s first public sector organisation to qualify as a delivery partner with the Green Climate Fund through the relevant mechanism. The official said this had been achieved by only three members and without technical assistance. He argued that this status could help the authority develop technical proposals and bring more climate finance into Pakistan. Rehman was not convinced that this achievement alone justified a separate authority. She argued that Green Climate Fund financing had already been coming to Pakistan through government structures and questioned why a completely new authority was needed when a climate finance office could operate within the ministry. She again asked why project development and technical hiring could not be handled directly by the ministry. Her central question remained the same throughout the discussion: what exactly could the new authority do that the ministry could not already do? The ministry told the committee that it had a supervisory and controlling role over the authority and that the authority’s budget passed through the ministry. However, Rehman continued to question how effective that control was if the authority could hire staff and exercise statutory powers separately. She asked officials to explain how rotating officials into a separate authority would make climate work more efficient when the ministry itself was losing development resources. Professor Dr Zahoor Ahmed Bazai, who identified himself as an unpaid member nominated to the authority and as a climate change academic, defended the institution. He told the committee that the authority was included in the climate law and that members had been nominated through the formal process. He argued that the authority was intended to provide expertise and serve an advisory role. Rehman said her criticism was not directed personally at individual members. She said the bigger problem was duplication between institutions and the growing number of attached bodies dealing with similar climate matters. The committee chairperson was also critical of the presentation the authority gave. Rehman said the presentation was not strong enough to be used by Pakistan at an international climate forum and described it as outdated in style. She said that if the authority wanted to demonstrate its value and

  • | |

    Atiqa Odho, Marina Khan oppose Sania Saeed’s grandmother role

    Aap Ki Izzat has only been on air for three episodes and has already become one of the most discussed dramas of the year. Written by Umera Ahmed, produced by Nina Kashif and Momina Duraid, and directed by Saifee Hassan, the Hum TV drama has amassed around 10 million views and earned remarkable TRP ratings in a very short time. Its cast, featuring Ahsan Khan, Saif Ali Khan, Urwa Hocane, Sania Saeed and Nauman Masood, has been widely praised. But not everyone is entirely comfortable with every casting choice, and two of Pakistan’s most respected actresses have said so plainly. Atiqa Odho and Marina Khan, appearing as judges on Kya Drama Hai alongside Nadia Khan, praised the drama warmly before raising a specific concern about Sania Saeed being cast as a grandmother. Their objection was not about the quality of the performance, which both acknowledged as excellent, but about the casting itself, specifically the age dynamic it creates on screen. Atiqa Odho was candid about why the role unsettled her. “I am a bit sceptical about Sania playing a grandmother because I find it difficult to accept if it’s given to me,” she said. “Sania and I started our careers together in Sitara Aur Mehrunnisa, so when I see her playing such an elderly character, I think, ‘Oh my God, why is she playing this old role? She has become a grandmother at such a young age.’” She was quick to separate her personal reaction from her professional assessment, adding: “Sania has played the role beautifully, though. But I feel like we girls are becoming old now.” The remark was as much about time and self-reflection as it was about casting. Watching a contemporary from the earliest days of her career play a grandmother is not simply a professional observation. It is a mirror held up to one’s own passage through time, and Odho’s reaction captured that complicated feeling with characteristic honesty. Marina Khan echoed the concern but framed it through the specific dynamic within the drama itself. “Nauman Masood and Sania are of the same age,” she said. “I couldn’t digest Sania in such an old-age character, especially when actors of her own age are playing younger roles. Nauman Masood, in particular, was shown as younger than her.” She too made sure to credit the performance even while questioning the decision. “There is no doubt that she is a tremendous actor and is playing the role perfectly, but they should have cast much younger actors opposite her.” Aap Ki Izzat continues to air on Hum TV and remains among the most watched and most discussed dramas currently on Pakistani television.

  • |

    Trump approves landmark US-Saudi nuclear pact

    US President Donald Trump has approved a landmark civilian nuclear agreement with Saudi Arabia, marking a major step in expanding strategic cooperation between the two countries. The proposed deal is expected to remain in effect for 30 years and is valued at tens of billions of dollars. The agreement is designed to support the development of Saudi Arabia’s civilian nuclear energy program while giving American companies a leading role in building the kingdom’s nuclear infrastructure. It is expected to create significant investment opportunities for US firms and strengthen long-term energy cooperation between Washington and Riyadh. Under the proposed framework, American companies could participate in constructing nuclear facilities across Saudi Arabia. The agreement also allows for the possibility of building a uranium enrichment plant in the kingdom if future joint studies by both governments determine that such a project is necessary. US officials say the deal will enable Washington to remain closely involved in the development of Saudi Arabia’s nuclear program. They believe this cooperation will help ensure that the kingdom’s nuclear activities remain focused on peaceful civilian purposes. The Trump administration is expected to submit the agreement to the US Congress in the coming days. The pact is being introduced under Section 123 of the US Atomic Energy Act of 1954, which provides the legal framework for civilian nuclear cooperation between the United States and foreign countries. Once submitted, Congress will have about 90 days to review the agreement. If lawmakers do not reject it during the review period, the agreement will automatically enter into force. Blocking the deal would require Congress to pass a joint resolution with enough votes to override a possible presidential veto. According to officials familiar with the proposal, the agreement does not include the “Gold Standard,” a condition that permanently bars partner countries from enriching uranium or reprocessing spent nuclear fuel. These activities can potentially be used in the production of nuclear weapons. The proposed agreement also reportedly does not include the International Atomic Energy Agency’s Additional Protocol. This protocol allows international inspectors to conduct broader inspections and monitor undeclared nuclear facilities. Its absence has raised concerns among some non-proliferation experts and lawmakers. US officials, however, insist that the agreement contains strong safeguards required under American law. They stress that the deal does not obligate the United States to transfer sensitive uranium enrichment technology or nuclear fuel cycle capabilities to Saudi Arabia. Instead, it establishes a legal pathway for future civilian cooperation while requiring separate approvals for any advanced technology transfers. The agreement follows earlier discussions between senior US and Saudi officials, who signed a preliminary framework last year to expand cooperation in the peaceful use of nuclear energy. The proposal has generated debate in Washington. Several Democratic lawmakers, along with some Republicans, have argued that stronger safeguards should be included before the agreement is approved. They believe stricter restrictions are necessary to reduce the risk of nuclear weapons proliferation in the Middle East. Saudi Arabia has repeatedly stated that its nuclear program is intended to meet growing energy demands and diversify the country’s energy resources. However, Crown Prince Mohammed bin Salman has previously said that if Iran were to acquire a nuclear weapon, Saudi Arabia would also seek similar capabilities. His remarks have fueled international concerns about a possible regional nuclear arms race.

  • |

    FPCCI seeks industry consultation before revision of incremental power package

    ISLAMABAD: The Federation of Pakistan Chambers of Commerce and Industry (FPCCI) has called on the National Electric Power Regulatory Authority (Nepra) to consult industry representatives before making any changes to the Incremental Package for industrial electricity consumers. The business community has warned that revising the package without taking major industrial stakeholders into confidence could create market distortions, undermine the intended benefits of the scheme and potentially transfer additional costs to industries that do not qualify for incremental consumption incentives. In post-hearing comments submitted to Nepra on August 12, 2026, FPCCI said the regulator had already directed that the proposed changes to the Incremental Package should first be presented to and discussed with industry representatives before being brought back for approval. The federation welcomed the direction, describing meaningful stakeholder participation as essential for developing a workable electricity pricing mechanism for industrial consumers. FPCCI highlights delayed review FPCCI also raised concerns over the failure to conduct the package’s scheduled quarterly review. According to the federation, the Incremental Package was specifically designed to undergo a review every three months. However, no review had been conducted for approximately eight months. The federation said the prolonged delay had created uncertainty for industrial consumers and prevented the timely identification and correction of issues within the package. FPCCI urged Nepra to immediately carry out the overdue review and ensure that the quarterly review mechanism is followed consistently in the future. The federation argued that regular reviews were particularly important because industrial electricity consumption, production conditions and operating costs can change significantly over time. Major industry bodies seek participation FPCCI requested Nepra to formally engage leading industry organisations before the next hearing on the proposed revision. The organisations named by the federation include the Karachi Chamber of Commerce and Industry (KCCI), Korangi Association of Trade and Industry (KATI), All Pakistan Textile Mills Association (APTMA), as well as other major chambers and industrial associations. FPCCI said the participation of these organisations would allow the regulator to understand the practical challenges faced by different categories of industrial consumers. It stressed that the revised package should be based on actual industrial requirements and should not discriminate against existing consumers who are unable to qualify as incremental users. Warning against cost shifting The federation expressed concern that changes to the package could result in an unintended transfer of costs to non-incremental industrial units. FPCCI said any revised mechanism should ensure that incentives provided to additional electricity consumption do not create a financial burden for other consumers. It also called for clear safeguards to ensure that only genuine incremental electricity consumers receive the benefits of the package. According to the federation, the regulator should introduce mechanisms capable of preventing existing consumption from being presented as new or incremental demand merely to obtain preferential electricity rates. FPCCI maintained that a transparent verification system would be necessary to protect the integrity of the package and prevent potential misuse. Requests submitted to Nepra In its submission, FPCCI made a series of requests to the power regulator. The federation asked Nepra to formally consult FPCCI, KCCI, KATI, APTMA and other major industry bodies before the next hearing. It also requested the authority to provide sufficient advance notice of the date and time of any consultation, along with an online meeting link, so that FPCCI could coordinate participation by relevant chambers, associations and industrial representatives. The federation further sought a formal opportunity to present detailed recommendations on the proposed redesign of the Incremental Package. It called for safeguards restricting benefits to genuine incremental units and urged Nepra to immediately conduct the quarterly review that has remained pending for the past eight months. FPCCI also proposed making consultation with major industrial chambers and associations mandatory before any future revision or review of the Incremental Package or similar electricity pricing schemes. Invitation to power-sector institutions In a further effort to promote direct dialogue, FPCCI invited Nepra, the Power Planning and Monitoring Company (PPMC) and the Central Power Purchasing Agency-Guaranteed (CPPA-G) to visit its head office in Karachi. The federation proposed holding detailed discussions with the relevant institutions in the presence of industry representatives. FPCCI said direct engagement would provide an opportunity for all stakeholders to examine the existing mechanism, identify practical shortcomings and develop solutions based on actual operating conditions in the industrial sector. It maintained that consultation could help bridge the gap between regulatory objectives and the realities faced by industrial consumers. Industry seeks predictable power policy The dispute over the Incremental Package comes amid continued concerns among industrial consumers over electricity costs, competitiveness and the predictability of power-sector policies. For export-oriented and energy-intensive industries, electricity pricing is a major component of production costs. Business representatives have therefore repeatedly called for stable and transparent tariff mechanisms that allow companies to plan production and investment decisions. FPCCI said any changes to the Incremental Package should balance the objective of increasing electricity consumption with the need to maintain fairness among different categories of industrial consumers. The federation believes that a properly designed package, supported by regular reviews and meaningful industry consultation, could encourage additional industrial electricity consumption without imposing unintended costs on existing consumers.

  • | |

    IHC reserves verdict on judges’ appointments ple…

    The Islamabad High Court (IHC) on Thursday reserved its verdict on the maintainability of a petition challenging the delay in the approval of judicial appointments for high courts across the country. Justice Arbab Muhammad Tahir heard the petition filed by advocate Luqman Zafar Chaudhary through his counsel Zahid Asif Chaudhry. The petitioner requested the court to direct President Asif Ali Zardari to approve a summary forwarded by the prime minister for the appointment of 19 additional judges and the confirmation of five judges in the Islamabad, Lahore, Sindh, Balochistan and Peshawar high courts. During the hearing, the petitioner’s lawyer argued that the Judicial Commission of Pakistan (JCP) had recommended the appointments during its meetings held on July 20 and 21. He said the summary was later sent to the president for approval, but no decision has been made despite the passage of more than two weeks. The counsel maintained that the delay is affecting the functioning of the superior judiciary. He informed the court that the tenure of an additional judge of the Sindh High Court has already expired, while the terms of four additional judges of the Peshawar High Court are expected to end within the coming days. The lawyer also told the court that reports suggest the government may issue notifications regarding the appointments within the next 48 hours. Justice Tahir repeatedly questioned whether a constitutional petition could legally be maintained against the president. He asked the petitioner’s counsel to cite any previous court ruling in which a writ had been issued against the president regarding the exercise of constitutional powers. The court observed that the judgments presented by the petitioner did not support the argument that courts could direct the president in matters governed by Article 48 of the Constitution. Justice Tahir asked whether any legal precedent existed requiring the president to act on such matters through a judicial order. The petitioner’s counsel argued that Article 48 requires the president to act on the advice of the prime minister or the cabinet. He maintained that the president has no independent authority to indefinitely delay judicial appointments once the Judicial Commission has completed its recommendations. The lawyer further argued that the Ministry of Law is the competent authority to issue appointment notifications after the completion of the constitutional process. He claimed that the president’s role in the appointment process is largely formal and that unnecessary delays should not hinder the functioning of the judiciary. The petitioner requested the court to seek responses from the federal government, the Prime Minister’s Office and the Ministry of Law regarding the status of the pending summary. However, the court declined to issue notices at this stage.

  • |

    Robert Pattinson’s daughter adorably calls him ‘Daddy Batman’

    Robert Pattinson and his fiancée, actress and singer Suki Waterhouse, are enjoying parenthood, and the couple’s two-year-old daughter has come up with a heartwarming nickname for the Hollywood star. During a recent podcast appearance, Waterhouse opened up about family life and shared a sweet glimpse into how their daughter views her father while he films his superhero projects. The actress revealed that their little girl now affectionately calls Pattinson “Daddy Batman,” a nickname inspired by the actor’s iconic role as the Caped Crusader. According to Waterhouse, the toddler has become so used to seeing her father dressed in the Batman costume during video calls that she naturally associates him with the beloved DC superhero. She explained that balancing work and family often leads to unusual moments. While she may be at home with their daughter, Pattinson is frequently on set in full costume and makeup. During FaceTime calls, he sometimes appears wearing heavy eye makeup, fake injuries, and blood as part of filming. Despite his dramatic appearance, Waterhouse said their daughter is completely unfazed. Instead of being frightened, she happily chats with him and accepts his superhero look as normal. The actress shared that their daughter is a cheerful and outgoing child who has grown accustomed to seeing her father transform into different characters for his acting career. She joked that the little one barely notices the elaborate costumes anymore, making the nickname “Daddy Batman” a natural part of their daily life. Pattinson, best known for his performances in the Twilight franchise and several critically acclaimed films, has been in a relationship with Waterhouse since 2018. After years of dating, the couple confirmed their engagement in 2023 and welcomed their first child in 2024. Although the pair generally keep their family life private, Waterhouse occasionally offers fans small insights into their experience as first-time parents. Her latest comments have delighted fans, who praised the adorable nickname and the wholesome family dynamic. Pattinson is expected to return as Batman in the highly anticipated sequel directed by Matt Reeves. The upcoming film will see the actor reprise his role as Gotham’s legendary protector, a performance that has already earned praise from audiences worldwide. As production continues, it appears that Pattinson has gained one very special fan at home. While millions know him as Batman on the big screen, his daughter has made the title far more personal by lovingly calling him “Daddy Batman” — a nickname that perfectly blends Hollywood stardom with family life.

Leave a Reply

Your email address will not be published. Required fields are marked *